Our project management team works closely with owners and design professionals to develop and construct projects that meet budget expectations. While FCF General Contractors have successfully completed many “traditional” design-bid-build type projects, many of our projects have been non-traditional, requiring specialty equipment, and the expertise of our skilled staff.

Medical Gas System Upgrade

Client: University of California, Davis Medical Center
Project Manager: Anthony Chung Yee

This project included the construction of a new 2,862 sq. ft. CMU medical gas bulk storage enclosure, site work, underground utilities and interior piping for new Surgery and Emergency Services Pavilion. The project also includes new Oxygen, Nitrogen, and CO2 bulk storage tanks and Vaporizers. The work includes architectural, civil, structural, mechanical, plumbing, and electrical.

Remodel for Cardiovascular CT Scanner

Client: University of California, Davis Medical Center
Project Manager: Anthony Chung Yee

This project consisted of remodeling approximately 1,625 sq. ft. of existing hospital interior space, originally offices and shell space, to create a new CT scanner suite. The work included architectural, structural, mechanical, plumbing, electrical, and hazardous materials abatement. The project was completed in full compliance with OSHPD (Office of Statewide Health Planning and Development) and University of California, Davis Medical Center requirements.

Bainer Hall, RM 1236B - Remodel for Engineering

Client: University of California, Davis Campus
Facilities Operation & Maintenance
Project Manager: Donald Brown

This project consisted of constructing a 960 sq. ft. research laboratory, within an existing laboratory located in Bainer Hall. The work included architectural, civil, structural, mechanical, plumbing, and electrical.

Vascular Clinic Remodel

Client: University of California, Davis Medical Center
Project Manager: Dave Brooks

This project consisted of renovating 2,718 sq. ft. of an existing dermatology clinic into a vascular clinic at the Lawrence J. Ellison Ambulatory Care Center. The work included architectural, structural, mechanical, plumbing and electrical work.

N5 RSP Remodel for Dialysis Department

Client: University of California, Davis Medical Center
Project Manager: Dominick Giglini
 
This project consisted of 2,670 sq. ft. interior remodel of the Endoscopy Department. The work included installation of new dialysis water and drain connections and acid resistant waste piping below the floor. Electrical work includes re-circuiting and adding new emergency power receptacles. The project also included demo, infilling of doorways, flooring, patch and paint.

Path Installation of Grossing Stations

Client: University of California, Davis Medical Center
Project Manager: Michelle Twist

This project consisted of the interior remodeling of existing space to replace 3 Pathology grossing workstations and install 2 new self-contained stand alone workstations. The work included architectural, structural, mechanical, plumbing, and electrical work.

ASB: Reconfigure Building Furniture

Client: University of California, Davis Medical Center
Project Manager: Michelle Twist

This project consisted of the interior remodeling of existing space to create a new Retail Shop in the Administrative Support Building (ASB). The work includes architectural, structural, mechanical, and electrical.

Sagres Remodel

Client: University of California, Davis Campus
Real Estate Services Division
Project Manager: Susan Della

This project consisted of 11,958 sq. ft. of interior remodel, to convert existing warehouse into a mouse laboratory vivarium. The project also included new exterior site improvements to include a CMU emergency generator enclosure and Title 24 requirements. The work included architectural, civil, structural, plumbing, mechanical, and electrical.